Oracle Identity Governance and OAM 12.2.1.4 lose Premier Support on December 31: upgrade to 14c or replace?
OIG and OAM 12c leave Premier Support at the end of 2026, and new security patches stop unless you pay for Extended Support. Here's what each option costs you in time and risk, and what 14c changes.
part 3 of 3 · Before you sign an identity contractthe ideaPremier Support for OIG and OAM 12c ends this year. Decide on 14c now.
after reading, you can- Explain to your board what stops in January if OIG and OAM stay on 12c
- Work out whether your estate should upgrade, buy a year of Extended Support, or replace OIG
- Spot the 14c blockers early: GTC connectors, SIMPLE-mode WebGates, old TLS and custom Java
Oracle stops Premier SupportdefinitionThe stage you're in today. Your normal support fee pays for it, and Oracle keeps fixing bugs and security holes until it runs out. for Oracle Identity Governance and Oracle Access Management 12c at the end of December 2026. If your company signs people in or hands out access through either product, decide this quarter whether you upgrade to 14c, pay for Extended Support or replace it. This guide lays out the dates, what each option costs you in time and risk, and the upgrade order we'd use.
Your logins still work in January. What stops is Oracle fixing the security holes in them
Oracle Identity Governance (OIG) decides who gets which accounts in your company, and takes them away when people leave. Oracle Access Management (OAM) is the sign-in gate in front of many internal web apps. 12.2.1.4 is the last 12c release, and Oracle's full support for that line runs out when December ends. You can pay extra for one more year of fixes, upgrade to 14c, or move to something else. If nobody picks, the system that controls everyone's access stops getting security fixes, and your auditors will ask about it.
It's like the lock company that serviced your office's master-key system telling you it'll stop cutting new keys and fixing faulty locks for that model. The doors still open, but if someone finds a way to pick that lock, nobody is coming to change it unless you pay for a late service plan or fit the new model.
- Companies running OIG or OIM 12c
- Teams with OAM WebGates on web apps
- Oracle E-Business Suite shops
- Auditors and risk owners
- IAM and middleware engineers
Why it matters to you
Nothing breaks on the first of January. Logins keep working and the nightly jobs keep running. What changes is the patch stream. Oracle's quarterly Critical Patch Updates are how security holes in these products get fixed, and the first one after Premier Support ends is due on January 19, 2027.
That patch stream has mattered a lot here. CISA lists two flaws in these exact versions as exploited in the wild. CVE-2025-61757 lets an attacker with no login take over Identity Manager over HTTP, and it affects 12.2.1.4.0 and 14.1.2.1.0. CVE-2021-35587 does the same to Oracle Access Manager 12.2.1.4.0. Both are rated 9.8 out of 10. Each one was fixed in a regular quarterly patch, which a system left on Sustaining SupportdefinitionThe stage you drop to without Extended Support. Oracle still helps and hands over old patches, but writes no new fixes or security patches. stops getting.
For a regulated business, the first cost is usually an audit finding. Auditors often look at the access system early, and "no longer gets vendor security fixes" is a hard thing to explain to them. The second cost is time. An OIG upgrade touches everything custom you've built on it, so it runs for months, and people who know Oracle IAM get harder to book as the date gets closer.
-
01 Premier Support ends
Right now your normal support fee pays for Oracle's fixes. That lasts until the end of December.
-
02 You choose Extended or not
Extended Support keeps quarterly patches coming until December 2027, but it's an added fee and won't certify new third-party versions.
-
03 Without it, Sustaining
Oracle still answers questions and hands over old patches. New fixes, security alerts and new certifications stop.
-
04 The January patch arrives
If it fixes a hole in OIG or OAM 12c, only Extended Support customers get it. Everyone else stays exposed.
-
05 14c is the supported road
14.1.x is the line Oracle supports to December 2030. You can only get there from 12.2.1.4, so patch up first.
For engineers: the Lifetime Support Policy lists OIG, OAM, Oracle Unified Directory and Oracle Internet Directory together as 12.2.x, so the directory under your OIG install has the same clock. Each stage runs to the last day of its month. Oracle's Technical Support Policies say Extended SupportdefinitionAn optional paid stage after Premier. For OIG and OAM 12c it keeps patches coming to the end of 2027, but doesn't certify new third-party versions. is generally offered only on a product's terminal patch set, and you keep paying Premier fees as well. If you're still on 12.2.1.3, ask Oracle what that means for you before you count on Extended Support, and plan for two hops to 14c instead of one.
The dates and what each support stage gives you
| Product | Released | Premier ends | Extended ends | Sustaining |
|---|---|---|---|---|
| OIG 12.2.x | Aug 2017 | Dec 31, 2026 | Dec 31, 2027 | Indefinite |
| OAM 12.2.x (incl. WebGates) | Aug 2017 | Dec 31, 2026 | Dec 31, 2027 | Indefinite |
| OUD and OID 12.2.x | Aug 2017 | Dec 31, 2026 | Dec 31, 2027 | Indefinite |
| OIG and OAM 14.1.x | Mar 2025 | Dec 31, 2030 | Dec 31, 2033 | Indefinite |
| OUD and OID 14.1.x | Mar 2025 | Dec 31, 2030 | Dec 31, 2033 | Indefinite |
| OAAM 11.1.2.x (old adaptive access) | Aug 2012 | Ended Dec 2020 | Ended Dec 2021 | Indefinite |
| Stage | Security patches | New certifications | Cost |
|---|---|---|---|
| Premier | Yes, every quarterly patch | Yes | Standard support fee |
| Extended | Yes, quarterly patches continue | Not with new third-party versions | Premier fee plus an Extended fee |
| Sustaining | No new ones. Only fixes made earlier | No | Standard support fee |
The dates to put in the plan
- Mar 13, 2025Oracle releases IAM 14c
Oracle said 14c and 12.2.1.4 would be supported side by side for at least two years, to give customers time to plan.
- Nov 21, 2025CISA adds the OIG flaw to KEV
CVE-2025-61757 hit 12.2.1.4.0 and 14.1.2.1.0. Teams on Premier Support got the fix in the October 2025 quarterly patch.
- Dec 31, 202612.2.x Premier Support ends
- Jan 19, 2027First quarterly patch after Premier
From here on, only teams paying for Extended Support get new 12c fixes. Everyone else waits for 14c.
- Dec 31, 202712.2.x Extended Support ends
No paid option for new 12c fixes after this.
- Dec 31, 203014.1.x Premier Support ends
Oracle has also started monthly Critical Security Patch Updates in the months between the quarterly ones, and the next two land in November and December. Both arrive while 12c is still in Premier Support, so use them. A 12.2.1.4 system that's fully patched is also the documented starting point for the 14c upgrade.
Your options: upgrade, bridge or replace
We see four realistic moves. Most estates end up combining two of them, usually Extended Support as a bridge while an upgrade or a replacement finishes.
| Option | What you do | Support you end up with | The catch |
|---|---|---|---|
| Upgrade in place to 14c | Patch 12.2.1.4 fully, then run the Upgrade Assistant on the existing domain | Premier to Dec 2030 | Servers are down during the upgrade, and a failure means restoring from backup |
| Out-of-place upgrade to 14c | Build 14c on new servers, then clone 12c and upgrade the copy, or migrate the data across | Premier to Dec 2030 | Extra hardware. The data-migration route also leaves some things behind (see below) |
| Extended Support as a bridge | Pay the Extended fee and keep patching 12.2.1.4 | Fixes to Dec 2027 | It buys one year. The upgrade or replacement still has to happen |
| Replace OIG, OAM or both | Move governance to another IGA product and sign-in to a cloud identity provider | Whatever the new vendor offers | Every connector, workflow and WebGate app gets rebuilt or re-pointed |
Upgrading is usually the shorter road when OIG works and people mostly complain about its age. You keep your roles, approval workflows and audit history, and Oracle says 14c is certified with 11g and 12c Oracle connectors. Replacing makes more sense when OIG has turned into a pile of custom Java that only one contractor understands, or when the company has already bought another governance or sign-in product and OIG is the holdout.
Be realistic about replacement timelines. Netwrix, which sells a competing product, writes that full-scope implementations on larger platforms often take more than 12 months. SailPoint's own case study on PG&E describes replacing a large OIM estate in eleven months. Either way, a replacement started this quarter won't finish before Premier Support ends, so price in Extended Support for the overlap.
- Nobody has to rebuild your roles, workflows or audit history
- Oracle certifies 11g and 12c connectors on 14c
- Custom Java has to be retested on JDK 17 or 21
- Generic Technology Connector and OAACG checks are gone
- Supported by Oracle to the end of 2030
- You're still running WebLogic, SOA Suite and an Oracle database
- A chance to drop years of custom code nobody wants
- Every connector and approval flow gets rebuilt
- Apps that trust WebGate headers break. They need a gateway or new code
- OAM and the new sign-in service run side by side for months
- Extended Support usually covers the overlap
- Nobody has to patch WebLogic or SOA Suite for identity again
If you look at replacing, check what each vendor actually publishes. We didn't find an official OIM migration guide from Microsoft, though it has one for SAP Identity Management. A moderator on Microsoft's Q&A site said in 2023 that direct inbound provisioning from OIM to Azure AD, now Entra ID, isn't supported. Saviynt's comparison page points to migration accelerators from service providers. Oracle's cloud option is Oracle Access Governance, a cloud IGA service, and Oracle's tutorials show it working alongside OIG rather than as a migration path. If you're torn, we can price both routes against your own inventory in an assessment.
What changes when you move to 14c
Oracle's release notes and upgrade guides list the changes below. The first few decide whether your custom code survives. The rest decide how many application teams you'll need to call.
The 14c changes that matter for a 12.2.1.4 estate
OIG and OAM 14c are certified on JDK 17 and 21, on WebLogic and Fusion Middleware Infrastructure 14.1.2.0.0. Custom event handlers and scheduled tasks compiled for older Java should be rebuilt against JDK 17 or 21 and retested.
Oracle says OIG now uses its identity directory service instead of the User/Role API. Anything custom that reached into that layer needs checking.
GTC, used to build quick flat-file and database connectors, isn't supported in 14c. Each GTC connector needs a replacement before cut-over.
Segregation-of-duties checks through Oracle Application Access Controls Governor aren't supported. Oracle points you to OIG's own Identity Audit feature.
Reconciliation moves from the System Administration console to a new screen in the Self Service console. Runbooks and training need updating.
Screens built on OJET get version 17.1 and Oracle's Redwood look. The old cache is gone too, swapped for JCS, which Oracle says copes better with distributed caching.
All three drop TLS 1.1 and earlier. Anything still talking to them over old TLS fails after the upgrade.
OAM no longer supports SIMPLE mode between WebGates and the server, and Simple Security Mode isn't offered at install. WebGates on SIMPLE mode move to a supported mode first.
Authorization rules are evaluated with GraalVM instead of Jython. Oracle says behavior is unchanged, but rules with scripted conditions deserve a test.
Oracle released 14c as containers as well. If you go that way, OIG on Kubernetes needs WebLogic Kubernetes Operator 4.2.10, a shared persistent volume and Oracle Database 19.23 or later.
The out-of-place migration route has its own surprises, and they're easy to miss because the in-place and cloned routes don't hit them. Oracle's guide says it won't migrate user-defined fields created through Deployment Manager or ADF sandboxes, so custom fields and custom database indexes have to be created again on 14c. User passwords don't migrate either, so you'll need SSO or LDAP as the authentication source. And the 12c connector directory isn't copied, so somebody has to copy it by hand or download the 14c connector versions.
WebGates are kinder than most people expect. Oracle's certification matrix says the 14c OAM server works with 12.2.1.4 WebGates, so you don't have to replace every WebGate on cut-over night. There's one trap. Oracle warns that if the OAM server is upgraded and a WebGate isn't, SSL between them can fail, because 14c rejects MD5 certificates and TLSv1. Oracle's fix is to re-enable those in the server's Java security policy or to upgrade the WebGate. Pick one before the window, not during it.
| Layer | Certified for 14c | What to check in your estate |
|---|---|---|
| Java | JDK 17.0.12+ or 21.0.4+ | Custom code built for JDK 8 or 11 |
| WebLogic and FMW | 14.1.2.0.0 | Custom WebLogic security providers and start scripts |
| Database | 19c (19.23+), 21c (21.17+), 26ai (23.26.1+) | Older 19c patch levels, and 12c or 18c databases |
| Operating system | Oracle Linux and RHEL 8.6+ or 9.2+, SLES 15 SP6+, Windows Server 2022 or 2025 | RHEL 7 or Oracle Linux 7 hosts |
| Directories | OAM 14c with OUD or OID 12.2.1.4 or 14c. OIG 14c with 14c directories | Whether your OIG directory moves in the same window |
Watch the database line. Oracle's launch blog mentioned 23ai, but the current certification matrix lists 19c, 21c and 26ai. Go by the matrix. Oracle also says the database has to be on a supported version before the upgrade starts, so a database upgrade may need its own window ahead of the IAM one.
Before: a 12.2.1.4 estate heading out of Premier Support
OIG and OAM run on WebLogic 12.2.1.4 with older Java. Some WebGates still use SIMPLE mode or old TLS, and custom connectors and event handlers were built years ago.
After: 14c with the blockers cleared first
OIG and OAM run 14.1.2.1.0 on JDK 17 or 21, on hosts or on Kubernetes. GTC connectors were replaced, WebGates moved off SIMPLE mode, and the directory runs a version certified with OIG 14c.
How we'd run the upgrade, starting with the inventory nobody wants to do
- 01Inventory everything custom
List every connector with its version, every GTC connector, custom event handler, plug-in, scheduled task, user-defined field and approval composite. On the OAM side, list every WebGate with its web server, version and security mode.
- 02Patch 12.2.1.4 fully
Oracle's guide says OIM must be fully patched with the latest bundle and required patches before the upgrade. Apply the latest quarterly patch while you're still on Premier Support.
- 03Fix the blockers on 12c
Move WebGates off SIMPLE mode and old TLS, replace GTC connectors and plan the OAACG change, all while still on 12c. Each of those is a smaller change on its own than inside the upgrade window.
- 04Get the platform ready
Bring the database to a certified version, build hosts on a certified OS and install JDK 17.0.12 or later. The 14c binaries go in a separate home and can be installed before the outage.
- 05Rehearse on a copy of production
Run the Upgrade Assistant in readiness mode first, then the full upgrade on a clone. Run reconciliation, provisioning and sign-in tests against real apps and time every step.
- 06Cut over and watch
Use the timings from the rehearsal to book the window. Afterwards, watch reconciliation runs, approval workflows and WebGate errors closely for the first full week.
Our Oracle identity page covers what we do on OAM and OIG, including Kubernetes builds and the old OAAM adaptive-access product, which left Extended Support in 2021.
What to do now
What to do now, by who you are
- Ask the IAM team one question: which version of OIG and OAM do we run, and what's our plan for December 31?
- Ask your Oracle account team for an Extended Support quote now, even if you hope not to need it.
- Decide by quarter end whether you upgrade or replace. Either way, budget for engineers now, before everyone else does.
- Check the exact version and patch level of every OIG, OAM, OUD and OID environment.
- Apply the latest quarterly and monthly patches while 12c is still in Premier Support.
- Build the custom-code and WebGate inventory, and flag GTC connectors, OAACG checks and SIMPLE-mode WebGates.
- Run the Upgrade Assistant's readiness check on a copy of production.
- Confirm CVE-2025-61757 and CVE-2021-35587 are patched on every OIG and OAM server.
- Put the support end date on the risk register with an owner and a target date.
- Agree with audit how you'll document compensating controls if Extended Support covers the gap.
- Send the IAM team the WebGate version and security mode on each of your web servers. They can't plan the cut-over without it.
- Plan any WebGate change on the 12c side, so the upgrade weekend doesn't need you.
# Java version the domain runs on $ $JAVA_HOME/bin/java -version # Installed patches in the 12c Oracle home $ $ORACLE_HOME/OPatch/opatch lsinventory # Readiness check from the 14c home. If it fails, you've learned it cheaply $ cd $ORACLE_HOME/oracle_common/upgrade/bin $ ./ua -readiness
Make the next upgrade routine
Most teams end up squeezed like this because the identity platform was treated as finished after go-live. Oracle now ships 14c fixes and features as bundle patches, usually quarterly, applied in place with little downtime. Treat those like any other scheduled change, and the next end date won't be a fire drill.
What keeps the next one boring
- 01Patch on Oracle's calendar
Book quarterly and monthly patch windows on the third Tuesday cadence Oracle publishes, and keep OAM server patches at the same or a higher level than your WebGates, as Oracle advises.
- 02Keep custom code in source control
Keep event handlers, plug-ins, scheduled tasks and UI changes in a repository, with a build that targets the JDK you actually run. The next JDK change is then just a rebuild.
- 03Shrink the custom surface
Each upgrade is a chance to retire handlers nobody uses and replace GTC-era connectors with certified ones. The fewer custom pieces, the shorter the next rehearsal.
- 04Don't expose admin and REST interfaces
The exploited OIG flaw sat in its REST web services and needed no login. Keep OIG and OAM admin and REST endpoints off the internet and limit who can reach them inside.
- 05Write down the support dates
Put the 14c dates, December 2030 for Premier and December 2033 for Extended, on the same calendar as your other platform end dates.
If the upgrade goes wrong
If the upgrade stalls or breaks
An in-place upgrade changes the domain you were running, so the way back is a restore. An out-of-place upgrade leaves 12c standing. Know which one you're doing before the window opens.
- 01Stop and holdfirst hour
- Don't keep retrying the Upgrade Assistant on a half-upgraded domain. Save its logs first.
- Warn app owners and the help desk that sign-in or access requests could be slow or failing. Freeze every other change on these servers.
- 02Decide: fix or roll backfirst hours
- Go through the Upgrade Assistant and server logs until you know which step failed. Don't guess.
- If it can't be fixed inside the window, restore the database schemas and domain from the backups taken before the upgrade.
- On an out-of-place upgrade, point the load balancer and WebGates back at 12c, which never stopped.
- 03Check access is rightfirst day
- Run test sign-ins on the most-used apps behind WebGates.
- Check that the HR reconciliation and the next provisioning run behave as before, so nobody gets or keeps access by mistake.
- Open a service request with Oracle while Premier Support still covers you.
- 04Learn and rebookfirst week
- Reproduce the failure on the rehearsal copy and add the fix to the runbook.
- Rebook the window from the new timings, and line up Extended Support if the delay pushes you past December.
What this could look like
Three Oracle IAM estates you might recognise, and what we'd do in each
- the setup
- A regional bank runs OIG for joiners, movers and leavers and OAM in front of 150 internal apps. It's fully patched, but the 14c project hasn't started.
- what happens
- December passes with no decision. The January patch fixes a remote flaw in OIG, the bank can't apply it, and the next audit flags the access system as unsupported.
- what to do
- Get an Extended Support quote now as insurance. Then start the inventory this month, so the cloned upgrade can be rehearsed early next year.
- the setup
- OIG has around 40 custom event handlers, several GTC flat-file connectors and an OAACG check for SAP. Most of it was written by people who've left.
- what happens
- The 14c rehearsal fails on GTC connectors and JDK 17 compile errors. The project stretches, and the team starts asking whether replacing OIG would cost less.
- what to do
- Go through the custom code and mark each piece keep, rewrite or retire. Price the upgrade and a replacement off that same list. Whichever wins, Extended Support covers the months in between.
- the setup
- OAM protects store and supplier portals through a mix of OHS, Apache and IIS WebGates. A few old ones still use SIMPLE mode or TLS 1.1.
- what happens
- The OAM server upgrade goes fine, but sign-in breaks on WebGates nobody upgraded, because the 14c server rejects their MD5 certificates and old TLS.
- what to do
- Move SIMPLE-mode WebGates on 12c first. For the rest, change the server's Java security policy as Oracle documents, or upgrade WebGates in waves.
We do this work alongside IAM teams, whether the answer turns out to be a 14c upgrade or a move to another governance product. You can hire Oracle IAM engineers for the upgrade stretch, and our identity governance practice covers the replacement route. If you'd rather start with a list of what's at risk, ask for an assessment.
What to take from this
- 01
OIG, OAM, OUD and OID 12.2.x leave Premier Support on December 31, 2026. After that, new quarterly patches go only to customers who pay for Extended Support.
- 02
Extended Support runs to December 31, 2027 and costs extra on top of your Premier fees. It's a bridge for a project that's already started.
- 03
12.2.1.4 is the only supported starting point for 14c. If you're on 12.2.1.3, that's two hops.
- 04
Fix SIMPLE-mode WebGates, old TLS, GTC connectors and OAACG checks on 12c, before the upgrade window.
- 05
An out-of-place upgrade that migrates data, instead of cloning, won't carry over user-defined fields, passwords or the connector directory. Plan for them.
- 06
Replacing OIG at a large firm can take a year or more. If that's your route, start now and budget for Extended Support over the overlap.
- How Cohash delivers Oracle Identity & Access Management: scope, roles and architecture
- How Cohash delivers SailPoint: scope, roles and architecture
- How Cohash delivers Saviynt: scope, roles and architecture
- Hire vetted Oracle Identity & Access Management engineers
- Identity governance
- Book a 30-minute working session with a senior engineer
01Will OIG or OAM stop working on January 1?
No. Both keep running. Premier Support for OIG, OAM, OUD and OID 12.2.x ends December 31, 2026, and what stops then is new patches from Oracle, starting with the quarterly patch due January 19, 2027. Extended Support, which costs extra, keeps them coming to December 31, 2027. After that only Sustaining Support is left, with no new fixes or security patches.
02Can we upgrade straight from 11g or 12.2.1.3 to 14c?
No. Oracle's upgrade guides say 12.2.1.4.0 is the only supported starting point for OIG and OAM 14c. From 12.2.1.3 you update to 12.2.1.4 first, and an 11g estate has a longer road.
03Do our 12c WebGates work with OAM 14c?
Yes, 12.2.1.4 WebGates are certified with the 14c server. Oracle warns, though, that SSL between an upgraded server and a WebGate that wasn't upgraded can fail on MD5 certificates and TLSv1. The fix is a Java security policy change on the server or a WebGate upgrade. WebGates on SIMPLE mode have to move to a supported mode either way.
04Is upgrading to 14c cheaper than replacing OIG?
Usually, when OIG works and the custom code is under control, because roles, workflows and history stay put. Replacement starts to make sense when the custom code is out of hand or the company already owns another governance product. Compare both against the same inventory.
05What does Extended Support cost?
Oracle charges an Extended Support fee for each support period, and you keep paying the standard Premier fee as well. Ask your Oracle account team to quote it for your licences.
06What database does OIG 14c need?
Check your database first. Oracle's certification matrix lists 19c from 19.23, 21c from 21.17 and 26ai from 23.26.1, Enterprise Edition (XE isn't supported). If yours is older, upgrade it before the IAM upgrade starts, since Oracle wants a supported database in place first.
Three questions, about a minute
Pick an answer and we'll tell you if it's right, and why it is or isn't. The score stays in this browser.
-
Q1Your OIG 12.2.1.4 upgrade slips to March 2027. How do you keep getting Oracle's security patches until it's done?
show the answer
B. Pay for Extended Support and keep patching 12c until it's done Sustaining Support gives you no new fixes. Extended Support, at an extra fee, keeps quarterly patches coming for 12.2.x until December 2027, which covers the gap.
-
Q2You're on 12.2.1.3 and want 14c. Which route does Oracle actually support?
show the answer
D. Update to 12.2.1.4 first, then upgrade to 14c Oracle's guides name 12.2.1.4.0 as the only supported starting point, and exporting and importing OAM policies between releases isn't certified.
-
Q3OAM is upgraded to 14c and sign-in fails on a few old web servers. What's the likely cause?
show the answer
A. The 14c server rejects the old WebGates' MD5 certificates or TLSv1 14c is certified with 12.2.1.4 WebGates, but Oracle warns SSL can fail when the server is upgraded and a WebGate isn't, because 14c rejects MD5 certificates and TLSv1.