erp

Moving off SAP ECC before mainstream maintenance ends.

Most ECC estates we see carry twenty years of custom ABAP and a PI/PO hub nobody wants to touch. The access model was usually built one firefight at a time. We plan the S/4HANA move around those problems, starting with the code.

S/4
platform dossierSAP S/4HANAERP
Vendor
SAP
Deployment
On-premise, private cloud (RISE) or public cloud
Release cadence
New release every two years, feature pack stacks in between
ECC 6.0 mainstream ends
End of 2027; optional extended maintenance to end of 2030
release watch
  • SAP ERP 6.0 mainstream maintenance ends 202704 Feb 2020
  • SAP ERP, private edition, transition option13 Oct 2026
in short·20-second read

Cohash plans and runs SAP S/4HANA conversions and new implementations, plus the work around them.

That includes SAP GRC access control, SAP Master Data Governance and moving PI/PO interfaces to SAP Integration Suite on BTP. SAP ERP 6.0 leaves mainstream maintenance at the end of 2027. We start with an inventory of custom code and interfaces, then sequence the conversion, integration move and access redesign so they don't collide.

you probably need this if
  • ECC 6.0 still sits on a non-HANA database and nobody has put a price on the move.
  • Nobody can say how many of your Z-programs still run, or who owns them.
  • PI/PO carries most of your interfaces and the team that built them has moved on.
Ask an engineer facts checked 2026-10-20 · 6 sources
how it runs
  1. 01Readiness and code inventory
  2. 02Path and sequence
  3. 03Mock conversions
  4. 04Cut-over and hypercare
you keep
  • Custom code inventory with usage data and a retire, fix or rebuild decision per object
  • Simplification item impact list mapped to your modules and owners
  • PI/PO interface catalog with target pattern and wave for each flow
+ 3 more documents
who does it
S/4HANA conversion lead (brownfield and selective data)ABAP developer for custom code remediation (ABAP Cloud)SAP Integration Suite developer (PI/PO migration) SAP Certified - Integration Developer SAP Certified - SAP Master Data Governance
sap-s4hana · release timeline
  1. 04 Feb 2020 SAP ERP 6.0 mainstream maintenance ends 2027 Mainstream maintenance for SAP Business Suite 7 core applications, including SAP ERP 6.0, runs to the end of 2027. Optional extended maintenance runs to the end of 2030. source ↗
  2. 13 Oct 2026 SAP ERP, private edition, transition option Business continuity from 2031 to 2033 for systems moved to SAP ERP, private edition on SAP HANA by 31 December 2030. A 13 October 2026 update says subscriptions may run to 31 December 2035, with further prerequisites. source ↗
  3. today · Oct 22, 2026
  4. no date yetS/4HANA 2025 release and FPS1The 2025 release follows SAP's two-year release cycle, with feature pack stacks in between. SAP Learning covers what changed in 2025 FPS1.source ↗
  5. no date yetSAP NetWeaver 7.5 and PO maintenanceSAP NetWeaver 7.5, the base for SAP Process Orchestration, stays in mainstream maintenance to the end of 2027, with extended maintenance available through 2030.source ↗
the story · sap s/4hana estate

From the first call to a setup your own team can run.

Here's what usually prompts a call about your SAP S/4HANA estate, what we do about it and in which order, and where you end up.

  1. chapter 01 · where it hurts

    Why teams reach out

    • ECC 6.0 still sits on a non-HANA database and nobody has put a price on the move.
    • Nobody can say how many of your Z-programs still run, or who owns them.
    • PI/PO carries most of your interfaces and the team that built them has moved on.
  2. chapter 02 · what we change

    How we solve it

    • ECC to S/4HANA conversion
    • Custom ABAP remediation
    • PI/PO to Integration Suite
    • SAP GRC Access Control
    • SAP Master Data Governance
    • Run support and staffing
  3. chapter 03 · how it runs

    Our approach

    • Readiness and code inventory
    • Path and sequence
    • Mock conversions
    • Cut-over and hypercare
  4. chapter 04 · where you end up

    What changes

    • The board picks a path from an inventory it can audit, and the custom code work is scoped to objects that actually run.
    • By the conversion weekend the PI/PO dependency is much smaller, and the interface knowledge lives in a catalog, not in one person's head.
    • Custom code inventory with usage data and a retire, fix or rebuild decision per object
    • Simplification item impact list mapped to your modules and owners
what we do

Our SAP S/4HANA work

6 kinds of SAP S/4HANA work, each run by engineers who have done it on live tenants.

  1. System conversion, selective data transition or a new implementation, chosen after we've run the readiness check, the simplification item list and a custom code analysis on your actual system.

  2. We sort Z-programs into retire, fix or rebuild, adapt code to the S/4HANA data model (MATDOC, ACDOCA, business partner) and move new extensions toward clean-core patterns where it pays off.

  3. An interface-by-interface inventory of SAP Process Orchestration, with each flow rebuilt, redesigned or retired in SAP Integration Suite on BTP, and cut over in waves.

  4. Ruleset clean-up, role redesign for Fiori and S/4HANA transactions, firefighter (EAM) setup and access request workflows that auditors can follow.

  5. MDG for business partner, material and finance objects, with data quality rules, change request workflows and the replication model to downstream systems.

  6. Basis, ABAP, functional and integration engineers for post-go-live support, onsite in the US or nearshore and offshore across time zones.

capability 01 / 06in production

ECC to S/4HANA conversion

System conversion, selective data transition or a new implementation, chosen after we've run the readiness check, the simplification item list and a custom code analysis on your actual system.

capability 02 / 06in production

Custom ABAP remediation

We sort Z-programs into retire, fix or rebuild, adapt code to the S/4HANA data model (MATDOC, ACDOCA, business partner) and move new extensions toward clean-core patterns where it pays off.

capability 03 / 06in production

PI/PO to Integration Suite

An interface-by-interface inventory of SAP Process Orchestration, with each flow rebuilt, redesigned or retired in SAP Integration Suite on BTP, and cut over in waves.

capability 04 / 06in production

SAP GRC Access Control

Ruleset clean-up, role redesign for Fiori and S/4HANA transactions, firefighter (EAM) setup and access request workflows that auditors can follow.

capability 05 / 06in production

SAP Master Data Governance

MDG for business partner, material and finance objects, with data quality rules, change request workflows and the replication model to downstream systems.

capability 06 / 06in production

Run support and staffing

Basis, ABAP, functional and integration engineers for post-go-live support, onsite in the US or nearshore and offshore across time zones.

typical situations

SAP S/4HANA situations we walk into

We pieced these together from SAP S/4HANA situations that come up a lot. They're patterns. You won't find a specific client in them.

case file 01

ECC 6.0 on Oracle with 9,000 Z-objects and a board date in 2027

composite · not a client story
  1. Beforethe situation

    ECC 6.0 EHP8 runs on an Oracle database with about 9,000 custom objects. The board wants a decision this year, and the last estimate came from a slide with no code analysis behind it.

  2. What we dothe work

    We run the readiness check and custom code analysis on a production copy and pull usage statistics to find which Z-objects still execute. The simplification items are mapped to module owners. Conversion, selective data transition and the private edition transition option are then costed side by side.

  3. Afterwhere you end up

    The board picks a path from an inventory it can audit, and the custom code work is scoped to objects that actually run.

case file 02

Six hundred PI/PO interfaces and one integration engineer who knows them

composite · not a client story
  1. Beforethe situation

    SAP Process Orchestration 7.5 runs around six hundred interfaces, many with Java mappings and file adapters. One engineer understands most of them, and S/4HANA conversion is planned for next year.

  2. What we dothe work

    We catalog every interface with sender, receiver, adapter and message volume, then retire the dead ones. Simple file and IDoc flows move to Integration Suite first. Interfaces that change with the S/4HANA data model are redesigned and move with the conversion.

  3. Afterwhere you end up

    By the conversion weekend the PI/PO dependency is much smaller, and the interface knowledge lives in a catalog, not in one person's head.

case studies

SAP S/4HANA case studies

All case studies
approach

How a SAP S/4HANA engagement runs

We don't start a step until the last one has produced something you can check.

  1. step 01

    Readiness and code inventory

    We run the SAP readiness check and a custom code analysis on a copy of production, read the simplification item list against your modules, and produce a usage-weighted list of Z-objects.

  2. step 02

    Path and sequence

    Conversion, new implementation or selective data transition is chosen against the inventory. We then sequence the Integration Suite waves, the GRC role redesign and MDG so they don't land on the same weekend.

  3. step 03

    Mock conversions

    At least two timed mock conversions on production-sized copies, with finance reconciliation signed off by the business after each one, so the downtime window is measured rather than guessed.

  4. step 04

    Cut-over and hypercare

    Production conversion with your team, followed by hypercare on period-end close, interfaces and access requests, then a handover of runbooks and the open-items log.

architecture

Where S/4HANA, GRC, MDG and Integration Suite sit together

Integration Suite on BTP replaces the PI/PO hub between S/4HANA and the systems around it. MDG governs master data before it reaches the core, and GRC checks access risk on the same users and roles that S/4HANA enforces.

Where S/4HANA, GRC, MDG and Integration Suite sit together Integration Suite on BTP replaces the PI/PO hub between S/4HANA and the systems around it. MDG governs master data before it reaches the core, and GRC checks access risk on the same users and roles that S/4HANA enforces. 01 · SYSTEMS AROUND THE CORE 02 · INTEGRATION AND GOVERNANCE 03 · ERP CORE 04 · ANALYTICS orders · accounts interface migration OData · IDoc replicate master data user provisioning role assignment CDC extract CDC extract Sf Salesforce accounts · orders Legacy ECC and PI/PO IDocs · RFC · fileinterfaces Ex Entra ID workforce identity SAP Integration Suite BTP · iFlows · APImanagement SAP MDG business partner ·material SAP GRC Access Control risk analysis ·firefighter S/4 SAP S/4HANA finance · logistics· Fiori Snowflake finance and supplydata Databricks forecasting models
Read the diagram as text
  1. Salesforce → SAP Integration Suite: orders · accounts
  2. Legacy ECC and PI/PO → SAP Integration Suite: interface migration
  3. SAP Integration Suite → SAP S/4HANA: OData · IDoc
  4. SAP MDG → SAP S/4HANA: replicate master data
  5. Entra ID → SAP GRC Access Control: user provisioning
  6. SAP GRC Access Control → SAP S/4HANA: role assignment
  7. SAP S/4HANA → Snowflake: CDC extract
  8. SAP S/4HANA → Databricks: CDC extract
use cases

Typical SAP S/4HANA projects

The work teams usually bring us, and the platforms SAP S/4HANA has to talk to while we do it.

  1. SAP-01 You're on ECC 6.0 and the 2027 date is now inside your budget cycle common request
  2. SAP-02 Custom ABAP volume makes every conversion estimate look like a guess common request
  3. SAP-03 PI/PO runs hundreds of interfaces and its own maintenance clock is ticking common request
  4. SAP-04 GRC rulesets were written for ECC transactions and don't cover Fiori apps common request
  5. SAP-05 Business partner and material data are duplicated across plants and company codes common request
  6. SAP-06 You need S/4HANA engineers for a program another integrator is leading common request
you keep

What a SAP S/4HANA engagement leaves behind

These are working documents, written against your configuration, so your team can run them without us.

  • inventory01

    Custom code inventory with usage data and a retire, fix or rebuild decision per object

    yours to keep
  • code02

    Simplification item impact list mapped to your modules and owners

    yours to keep
  • inventory03

    PI/PO interface catalog with target pattern and wave for each flow

    yours to keep
  • runbook04

    Mock conversion runbook with measured timings and finance reconciliation sign-off

    yours to keep
  • design05

    GRC ruleset and role design updated for S/4HANA transactions and Fiori apps

    yours to keep
  • design06

    MDG data model, change request workflow and replication design

    yours to keep
talent and delivery · sap s/4hana

Certified engineers, wherever you need them.

Some clients want a project team, some want a couple of engineers on theirs. Either works. Onsite, nearshore or offshore, with handovers across time zones that keep things moving.

Onsite

Engineers at your sites in the US

Nearshore

Overlapping hours with US teams

Offshore

Overnight progress on your backlog

All time zones

Coverage handed over across time zones

24-hour coverage · US Central time
OnsiteUS business hours
Nearshoreoverlapping US hours
Offshoreovernight progress
Combinedhandover, not hand-off
roles we staff
  • S/4HANA conversion lead (brownfield and selective data)
  • ABAP developer for custom code remediation (ABAP Cloud)
  • SAP Integration Suite developer (PI/PO migration)
  • SAP GRC Access Control consultant
  • SAP MDG technical and functional consultant
  • SAP Basis and HANA migration engineer
01Do we have to be off ECC by the end of 2027?

No, but the cost changes. Mainstream maintenance for SAP ERP 6.0 ends at the end of 2027. Extended maintenance runs to the end of 2030 at extra cost, and SAP also offers the SAP ERP, private edition, transition option for systems moved to SAP HANA by the end of 2030. Which of these fits depends on your contract, database and how fast the business can absorb a conversion.

02Brownfield conversion or greenfield implementation?

It depends on how much of your current process you'd keep. Conversion keeps history and configuration and is usually faster. A new implementation suits estates whose processes have drifted far from how the business now runs. Selective data transition sits between the two. We decide after the readiness check and custom code analysis, not before.

03What drives the cost of a conversion?

Custom code volume, the number of interfaces, data volume and quality, the number of company codes and countries, and how many test cycles the business can staff. The simplification item list and a custom code analysis turn most of those into numbers early.

04Should PI/PO move to Integration Suite before or after the S/4HANA cut-over?

Usually in waves that start before. Moving the simpler interfaces first takes load off the conversion weekend and gives your team practice with Integration Suite. Interfaces that change shape with S/4HANA, such as those touching business partner or material documents, move with the conversion.

05Does SAP GRC still make sense, or should access governance move elsewhere?

Some teams keep GRC Access Control for SAP-specific risk analysis and firefighter access, and connect it to SailPoint or Saviynt for enterprise-wide reviews. SAP Identity Management also leaves maintenance in 2027, so the identity side needs a decision either way. We map who owns each control before recommending a tool.

06Can you staff engineers into a program another partner is running?

Yes. We place ABAP, Basis, functional, GRC, MDG and Integration Suite engineers on contract, contract-to-hire or permanent terms, working onsite in the US or nearshore and offshore across time zones.

services

Related services

Projects on SAP S/4HANA usually end up touching one of these, so they're worth a look.

sources 6 sources linked last checked 2026-10-20 content fingerprint 47e7bbc7
  1. 01SAP News: maintenance to 2040 and Business Suite 7 dates (4 Feb 2020)news.sap.com ↗
  2. 02SAP News: SAP ERP, private edition, transition option updates (updated 13 Oct 2026)news.sap.com ↗
  3. 03SAP Community: 2025 release and two-year release cyclepages.community.sap.com ↗
  4. 04SAP Learning: new features in SAP S/4HANA Cloud Private Edition 2025 FPS1learning.sap.com ↗
  5. 05SAP Learning: SAP Process Orchestration to Integration Suite migrationlearning.sap.com ↗
  6. 06SAP blog: preparing for SAP Identity Management end of maintenance in 2027blogs.sap.com ↗
Reviewed by the Cohash team SAP S/4HANA is a trademark of its owner, used here to identify the platform. how we handle facts and data →
next step

Tell us what you're running. We'll tell you what we'd do first.

A 30-minute working session with a senior engineer. No slides.

useful to bring
  • The platform and the version you're on
  • Where you need to get to, and by when
  • What's custom: rules, plugins, integrations
  • Any audit finding or deadline driving it