supply chain

Warehouse, freight and planning on SAP, cut over without stopping the dock.

Supply chain go-lives fail in public: trucks wait, pickers stand still, planners go back to spreadsheets. We plan SAP EWM, TM and IBP work around the physical operation first and the system second, and we rehearse on the floor before cut-over.

EWM
platform dossierSAP EWM, TM & IBPSupply chain
Vendor
SAP
Products
Extended Warehouse Management, Transportation Management, IBP
Deployment
EWM and TM embedded or decentralized; IBP as SAP cloud service
SCM 7.0 / APO
Mainstream maintenance ends end of 2027, extended to 2030
release watch
  • SAP SCM 7.0 mainstream maintenance ends 202704 Feb 2020
  • S/4HANA 2025 release
in short·15-second read

Cohash implements and migrates SAP Extended Warehouse Management, SAP Transportation Management and SAP Integrated Business Planning.

Most programs we see involve moving off SAP SCM 7.0, where APO, standalone EWM and TM run today, before mainstream maintenance ends in 2027. We design the warehouse process, the freight planning model and the IBP planning areas, then integrate them with S/4HANA and run go-lives one site at a time.

you probably need this if
  • APO runs your planning and the person who wrote its macros is the only one who can change them.
  • WM in ECC has to go with the S/4HANA conversion and nobody has scoped EWM yet.
  • A new site goes live before peak and the automation vendor hasn't seen your integration spec.
Ask an engineer facts checked 2026-10-20 · 5 sources
how it runs
  1. 01Site and process walk
  2. 02Design and fit
  3. 03Floor rehearsal
  4. 04Site-by-site cut-over
you keep
  • Warehouse process design with process types, storage control and wave rules per site
  • APO function map showing the IBP or S/4HANA replacement for each macro and heuristic
  • MHE and material flow integration spec agreed with the equipment vendor
+ 3 more documents
who does it
SAP EWM functional consultant (inbound, outbound, waves)SAP EWM MFS and automation integration consultantSAP TM freight planning and settlement consultant SAP Certified - SAP S/4HANA Cloud Private Edition, Extended Warehouse Management SAP Certified - SAP S/4HANA Cloud Private Edition, Transportation Management
sap-supply-chain · release timeline
  1. 04 Feb 2020 SAP SCM 7.0 mainstream maintenance ends 2027 SAP Supply Chain Management 7.0, home of APO and standalone EWM and TM, is a Business Suite 7 core application. Mainstream maintenance runs to the end of 2027, with optional extended maintenance to the end of 2030. source ↗
  2. today · Oct 22, 2026
  3. no date yetS/4HANA 2025 releaseSAP's 2025 release ships PP/DS changes and follows the two-year release cycle, with feature pack stacks in between. Embedded EWM and TM ride the same cycle.source ↗
  4. no date yetRenamed SAP certificationsSAP Learning now lists EWM and TM certifications under SAP S/4HANA Cloud Private Edition names (C_S4EWM, C_S4TM) and IBP as SAP Certified - SAP Integrated Business Planning (C_IBP).source ↗
the story · sap ewm, tm & ibp estate

From the first call to a setup your own team can run.

Here's what usually prompts a call about your SAP EWM, TM & IBP estate, what we do about it and in which order, and where you end up.

  1. chapter 01 · where it hurts

    Why teams reach out

    • APO runs your planning and the person who wrote its macros is the only one who can change them.
    • WM in ECC has to go with the S/4HANA conversion and nobody has scoped EWM yet.
    • A new site goes live before peak and the automation vendor hasn't seen your integration spec.
  2. chapter 02 · what we change

    How we solve it

    • EWM implementation and migration
    • Transportation Management
    • IBP for supply chain
    • APO exit planning
    • Automation and MHE integration
    • Hypercare and staffing
  3. chapter 03 · how it runs

    Our approach

    • Site and process walk
    • Design and fit
    • Floor rehearsal
    • Site-by-site cut-over
  4. chapter 04 · where you end up

    What changes

    • Planning leaves SCM 7.0 on a schedule everyone knows, and the macros nobody used get left behind.
    • The site goes live with tested integration to the automation, and peak runs on a process the team has already practiced.
    • Warehouse process design with process types, storage control and wave rules per site
    • APO function map showing the IBP or S/4HANA replacement for each macro and heuristic
what we do

Our SAP EWM, TM & IBP work

6 kinds of SAP EWM, TM & IBP work, each run by engineers who have done it on live tenants.

  1. Embedded or decentralized EWM on S/4HANA, warehouse process types, storage control, wave and slotting design, RF and handheld transactions, and migration from WM or standalone EWM 9.x.

  2. Freight units, planning profiles, carrier selection, tendering and freight settlement in SAP TM, integrated with sales and purchase orders in S/4HANA.

  3. IBP planning areas, key figures and planning operators for demand, supply and inventory, with the data integration to S/4HANA that replaces APO DP and SNP.

  4. A function-by-function map from APO DP, SNP, PP/DS and GATP to IBP, embedded PP/DS and aATP in S/4HANA, with the custom macros and BAdIs that need a new home.

  5. Material flow system and PLC connections for conveyors and sorters, plus integration with third-party warehouse robotics, tested with the equipment vendor before go-live.

  6. EWM, TM and IBP consultants for go-live support across shifts, onsite in the US or nearshore and offshore across time zones.

capability 01 / 06in production

EWM implementation and migration

Embedded or decentralized EWM on S/4HANA, warehouse process types, storage control, wave and slotting design, RF and handheld transactions, and migration from WM or standalone EWM 9.x.

capability 02 / 06in production

Transportation Management

Freight units, planning profiles, carrier selection, tendering and freight settlement in SAP TM, integrated with sales and purchase orders in S/4HANA.

capability 03 / 06in production

IBP for supply chain

IBP planning areas, key figures and planning operators for demand, supply and inventory, with the data integration to S/4HANA that replaces APO DP and SNP.

capability 04 / 06in production

APO exit planning

A function-by-function map from APO DP, SNP, PP/DS and GATP to IBP, embedded PP/DS and aATP in S/4HANA, with the custom macros and BAdIs that need a new home.

capability 05 / 06in production

Automation and MHE integration

Material flow system and PLC connections for conveyors and sorters, plus integration with third-party warehouse robotics, tested with the equipment vendor before go-live.

capability 06 / 06in production

Hypercare and staffing

EWM, TM and IBP consultants for go-live support across shifts, onsite in the US or nearshore and offshore across time zones.

typical situations

SAP EWM, TM & IBP situations we walk into

We pieced these together from SAP EWM, TM & IBP situations that come up a lot. They're patterns. You won't find a specific client in them.

case file 01

APO DP and SNP on SCM 7.0 with 300 custom macros

composite · not a client story
  1. Beforethe situation

    Demand and supply planning run in APO on SCM 7.0, with around 300 custom macros and a nightly heuristic chain. Mainstream maintenance ends in 2027 and the S/4HANA conversion is already scheduled.

  2. What we dothe work

    We list every macro and job in the planning chain and mark which are still used. Each one maps to IBP configuration, a planning operator or a process change. Demand planning moves to IBP first and runs one full cycle in parallel with APO before supply follows.

  3. Afterwhere you end up

    Planning leaves SCM 7.0 on a schedule everyone knows, and the macros nobody used get left behind.

case file 02

A new automated DC that must ship before November peak

composite · not a client story
  1. Beforethe situation

    There's a new distribution center with shuttle storage and a sorter, and it needs to ship before peak. Nobody from the automation vendor has met the SAP team, and the integration spec is still in draft.

  2. What we dothe work

    We agree the telegram and interface spec with the equipment vendor in the first weeks and test EWM against the vendor's emulator before the hardware is commissioned. Full-shift rehearsals run on the real equipment, with go-live set well before peak.

  3. Afterwhere you end up

    The site goes live with tested integration to the automation, and peak runs on a process the team has already practiced.

approach

How a SAP EWM, TM & IBP engagement runs

We don't start a step until the last one has produced something you can check.

  1. step 01

    Site and process walk

    With the people who run it, we walk the warehouse or planning cycle and map inbound, putaway, picking, packing and shipping, or the monthly planning calendar. We write down where the current system is being worked around.

  2. step 02

    Design and fit

    Depending on the product, that means warehouse process types, storage control and wave design in EWM, freight units and planning profiles in TM, or planning areas and key figures in IBP. We map APO functions to their new home one at a time.

  3. step 03

    Floor rehearsal

    Users run full shifts on handheld devices, printers and conveyors in a test area. For IBP, planners run a full monthly cycle in parallel with the old process.

  4. step 04

    Site-by-site cut-over

    One site or planning area at a time, with stock loaded and counted beforehand and hypercare on every shift, then the next site uses the refined runbook.

architecture

How EWM, TM and IBP connect around S/4HANA

IBP plans demand and supply and sends the plan to S/4HANA. Orders flow from S/4HANA to TM for freight planning and to EWM for warehouse execution, while EWM drives conveyors and sorters through its material flow system.

How EWM, TM and IBP connect around S/4HANA IBP plans demand and supply and sends the plan to S/4HANA. Orders flow from S/4HANA to TM for freight planning and to EWM for warehouse execution, while EWM drives conveyors and sorters through its material flow system. 01 · PLANNING 02 · ERP CORE 03 · EXECUTION 04 · FLOOR AND PARTNERS supply plan actuals · master data sales orders deliveries freight requirements loading plan transport orders tendering SAP IBP demand · supply ·inventory S/4 SAP S/4HANA orders · stock ·aATP B2Bi Order management Sterling OMS · B2BEDI EWM SAP EWM putaway · picking ·waves SAP TM freight units · tendering Conveyors and sorters MFS · PLC telegrams Carriers tenders · status ·invoices
Read the diagram as text
  1. SAP IBP → SAP S/4HANA: supply plan
  2. SAP S/4HANA → SAP IBP: actuals · master data
  3. Order management → SAP S/4HANA: sales orders
  4. SAP S/4HANA → SAP EWM: deliveries
  5. SAP S/4HANA → SAP TM: freight requirements
  6. SAP TM → SAP EWM: loading plan
  7. SAP EWM → Conveyors and sorters: transport orders
  8. SAP TM → Carriers: tendering
use cases

Typical SAP EWM, TM & IBP projects

The work teams usually bring us, and the platforms SAP EWM, TM & IBP has to talk to while we do it.

  1. SAP-01 APO DP and SNP still run demand and supply planning on SCM 7.0 common request
  2. SAP-02 A new distribution center needs EWM live before peak season common request
  3. SAP-03 WM in ECC has to move to EWM as part of an S/4HANA conversion common request
  4. SAP-04 Freight is planned in spreadsheets and tendered by email common request
  5. SAP-05 Planners don't trust the consensus forecast and keep their own common request
you keep

What a SAP EWM, TM & IBP engagement leaves behind

These are working documents, written against your configuration, so your team can run them without us.

  • design01

    Warehouse process design with process types, storage control and wave rules per site

    yours to keep
  • document02

    APO function map showing the IBP or S/4HANA replacement for each macro and heuristic

    yours to keep
  • document03

    MHE and material flow integration spec agreed with the equipment vendor

    yours to keep
  • tests04

    Floor rehearsal script and results for each shift pattern

    yours to keep
  • plan05

    IBP planning area, key figure and operator design

    yours to keep
  • runbook06

    Site cut-over runbook with stock load and count procedure

    yours to keep
talent and delivery · sap ewm, tm & ibp

Certified engineers, wherever you need them.

Some clients want a project team, some want a couple of engineers on theirs. Either works. Onsite, nearshore or offshore, with handovers across time zones that keep things moving.

Onsite

Engineers at your sites in the US

Nearshore

Overlapping hours with US teams

Offshore

Overnight progress on your backlog

All time zones

Coverage handed over across time zones

24-hour coverage · US Central time
OnsiteUS business hours
Nearshoreoverlapping US hours
Offshoreovernight progress
Combinedhandover, not hand-off
roles we staff
  • SAP EWM functional consultant (inbound, outbound, waves)
  • SAP EWM MFS and automation integration consultant
  • SAP TM freight planning and settlement consultant
  • SAP IBP demand and supply planning consultant
  • IBP data integration developer (CI-DS, S/4HANA)
  • ABAP developer for EWM RF and enhancements
01Embedded or decentralized EWM?

It depends on volume, automation and how much downtime the warehouse can take during ERP maintenance. Embedded EWM keeps one system and is simpler to run. Decentralized EWM suits high-volume or heavily automated sites that need to keep shipping while the ERP is down. We decide per site, not per company.

02What replaces APO when SCM 7.0 leaves maintenance?

For most companies, IBP takes over demand and supply planning, while PP/DS and aATP move into S/4HANA. Custom APO macros and heuristics don't migrate automatically. We inventory each one and decide whether IBP configuration, an operator or a process change replaces it.

03How do you avoid a warehouse go-live that stops shipping?

We rehearse with real users on handheld devices, real labels and real equipment in a test warehouse or a closed section of the building. Go-live is scheduled outside peak, with stock counted and loaded the night before, and a staffed hypercare team on every shift for the first weeks.

04Can TM handle our carrier tendering and freight audit?

Usually yes. SAP TM covers tendering, carrier selection and freight settlement. Integration with carrier networks, rate engines or a separate freight audit provider needs design, and that's where most of the effort goes.

05How long does an IBP implementation take?

It depends on how many planning processes go live together, the number of key figures and how clean the master data is. Demand planning alone is a smaller project than demand, supply and inventory together. Data integration with S/4HANA is often the critical path.

06Do you staff EWM and IBP roles into an existing team?

Yes. EWM, TM and IBP people are some of the hardest to find, and we place them on contract, contract-to-hire or permanent terms.

services

Related services

Projects on SAP EWM, TM & IBP usually end up touching one of these, so they're worth a look.

sources 5 sources linked last checked 2026-10-20 content fingerprint 1238aa02
  1. 01SAP News: maintenance to 2040 and Business Suite 7 dates (4 Feb 2020)news.sap.com ↗
  2. 02SAP Community: 2025 release and two-year release cyclepages.community.sap.com ↗
  3. 03SAP Learning: C_S4EWM certificationlearning.sap.com ↗
  4. 04SAP Learning: C_S4TM certificationlearning.sap.com ↗
  5. 05SAP Learning: C_IBP certificationlearning.sap.com ↗
Reviewed by the Cohash team SAP EWM, TM & IBP is a trademark of its owner, used here to identify the platform. how we handle facts and data →
next step

Tell us what you're running. We'll tell you what we'd do first.

A 30-minute working session with a senior engineer. No slides.

useful to bring
  • The platform and the version you're on
  • Where you need to get to, and by when
  • What's custom: rules, plugins, integrations
  • Any audit finding or deadline driving it